Skip to product information
1 of 6

Risk Assessment And Method Statements (RAMS) Board, Yellow

Risk Assessment And Method Statements (RAMS) Board, Yellow

Regular price $4,748.36 CAD
Regular price Sale price $4,748.36 CAD
Sale Sold out
Estimated Ship Time 10-15 Business Days
Shipping calculated at checkout.

SKU:PBR101YL

Order from manufacturer

Quantity

RAMS Board Communication Centers

Make all documents and safety info visible and accessible from anywhere with the cutting-edge, robust, and eye-catching Risk Assessment and Method Statements (RAMS) Board. Perfect for lockout stations, health and safety documents, PPE distribution points, lean manufacturing, and more. Guarantee high visibility in any workplace!

Features 

  • Made of durable, UV stable, weatherproof HDPE
  • Easy to clean, reusable, and recyclable plastic
  • Simply mount included accessories to board*
  • Free-standing when assembled with leg supports or board only can be wall-mounted
  • Leg supports can be filled with water or bolted down for added stability (hardware included)
  • Configure accessories in any arrangement
  • Outer Dimension: 88-inchH x 73.6-inchW x 39.37-inchD
  • Product Weight: 127.31 lbs.
  • Average assembly time is 30 minutes
  • Dismantles for transport in approx. 5 minutes.

Includes:

  • Six transparent A4 size pockets (each pocket can hold up to 100 sheets)
  • Storage tray/pocket measures 4"H x 60"W
  • One Magnetic White Board 18" x 27"
  • One "Meet the person responsible for your safety" mirror 11"H x 8"W
View full details
Your cart
Product Product subtotal In Stock Stock Qty Quantity Price Product subtotal
Risk Assessment And Method Statements (RAMS) Board, Yellow
Risk Assessment And Method Statements (RAMS) Board, YellowPBR101YL
Estimated Ship Time 10-15 Business Days
Risk Assessment And Method Statements (RAMS) Board, YellowPBR101YL
Estimated Ship Time 10-15 Business Days
$4,748.36CAD/ea
$0.00CAD
$4,748.36CAD/ea $0.00CAD