Skip to product information
1 of 6

Risk Assessment And Method Statements (RAMS) Board, Yellow

Risk Assessment And Method Statements (RAMS) Board, Yellow

Regular price $4,748.36 CAD
Regular price Sale price $4,748.36 CAD
Sale Sold out
Item Ships From Manufacturer
Estimated Ship Time 10-15 Business Days
Shipping calculated at checkout.

Manufacturer: RAMS

Item # PBR101YLMfr. Model # PBR101YL

Order from manufacturer

Quantity
View full details

Product Details

The Accuform RAMS Board Communication Center (PBR101YL, yellow) brings risk assessments, method statements, lockout kits, PPE and first aid supplies together at one highly visible station on a jobsite or plant floor. It stands on its own leg supports, or the board alone can be fixed to a wall.

Features

  • Weatherproof, UV-stable HDPE that wipes clean and can be recycled
  • Leg supports take water ballast or can be bolted down for stability
  • Included accessories mount anywhere on the board with the supplied hardware
  • Magnetic dry-erase whiteboard for daily notes and briefings
  • Mirror printed "Meet the person responsible for your safety"
  • Two people can assemble it in about 20 to 30 minutes

Included

  • Six document holders in clear polycarbonate, each 12" H x 8½" W
  • One clear polycarbonate storage tray, 4" H x 60" W
  • Magnetic dry-erase whiteboard, 18" H x 27" W, supplied with two markers and an eraser
  • Acrylic safety mirror, 11" H x 8" W
  • "RAMS Board" title plaque with yellow/black diagonal side panels
  • Hardware for mounting the included accessories

Specifications

Item Safety Communication Board
Brand Accuform
Mfr. Model # PBR101YL
Colour Yellow
Material UV-stable HDPE
Overall Dimensions 88 in H x 73.6 in W x 39.37 in D
Weight 127.31 lb
Mounting Free-standing on legs or wall-mounted
Leg Stabilization Water fill or bolt-down
Document Holders 6, clear polycarbonate, 12 in H x 8.5 in W
Storage Tray 4 in H x 60 in W, clear polycarbonate
Whiteboard 18 in H x 27 in W, magnetic dry-erase
Mirror 11 in H x 8 in W, acrylic
Assembly 2 people, approx. 20 to 30 min
Other Colour Red (PBR101RD)
Your cart
Product Product subtotal In Stock Stock Qty Quantity Price Product subtotal
Risk Assessment And Method Statements (RAMS) Board, Yellow
Risk Assessment And Method Statements (RAMS) Board, YellowPBR101YL
Estimated Ship Time 10-15 Business Days
Risk Assessment And Method Statements (RAMS) Board, YellowPBR101YL
Estimated Ship Time 10-15 Business Days
$4,748.36CAD/ea
$0.00CAD
$4,748.36CAD/ea $0.00CAD